Refine your search:     
Report No.
 - 
Search Results: Records 1-20 displayed on this page of 137

Presentation/Publication Type

Initialising ...

Refine

Journal/Book Title

Initialising ...

Meeting title

Initialising ...

First Author

Initialising ...

Keyword

Initialising ...

Language

Initialising ...

Publication Year

Initialising ...

Held year of conference

Initialising ...

Save select records

JAEA Reports

Development of bearing units used in the rotating shaft system for power generation in the JAEA-Tokai Tandem accelerator

Otokawa, Yoshinori; Matsuda, Makoto; Abe, Shinichi

JAEA-Technology 2022-037, 23 Pages, 2023/03

JAEA-Technology-2022-037.pdf:5.38MB

Bearing units of rotating shaft system for power generation in the JAEA-Tokai Tandem accelerator had a short operating life from the beginning of the accelerator installation, and even after replacing the bearing unit, early failures often occurred. Therefore, the quantity and frequency of replacement are large, and a lot of time is spent in regular maintenance performed by opening the accelerator pressure vessel, and solving this problem has been a long-standing concern. As a result of considering the cause of this early failure, it was considered that the load caused by parallel, angular, and axial misalignment of the upper and lower bearing units was the cause. In order to solve this problem, we have developed a bearing unit having metal disc-spring couplings in the upper and lower flanges to allow for parallel, angular, and axial misalignment of bearing units. As a result, it is now possible to allow variations in the distance between castings and parallel, angular, and axial misalignment of the upper and lower bearing units. By installing the developed new bearing unit on the rotating shaft system and making improvements while continuing to use it in actual operation, we succeeded in reducing the early failure and extending the operating life by more than double. With this development, the maintenance time has been reduced to one week by reducing the number of replacing the bearing unit. In addition, we have realized one regular maintenance that was carried out about three times a year, and as a benefit, we were able to reduce the amount of sulfur hexafluoride (SF$$_{6}$$) gas, which is a greenhouse gas, to about 33$$sim$$50% per year. We describe about development of new bearing units and these maintenance status from 2006 to 2020.

JAEA Reports

Proceedings of the 34th Meeting for Tandem Accelerators and their Associated Technologies

Kabumoto, Hiroshi; Nakagawa, Sohei; Matsuda, Makoto

JAEA-Conf 2022-002, 146 Pages, 2023/03

JAEA-Conf-2022-002.pdf:9.89MB

"The 34th Meeting for Tandem Accelerators and their Associated Technologies" was held on July 21-22, 2022 organized by Nuclear Science Research Institute of the Japan Atomic Energy Agency. This meeting was held only on-line for preventing the spread of COVID-19 infection. The purpose of this meeting is contribution of development for related technology and of management of facilities through exchange of information among the researchers and engineers using and operating electrostatics accelerator facilities like tandem accelerators. There were 25 presentations which contains current status report of facility, technical development of accelerator, research of application. The total number of participants was a hundred, from 26 universities, research organizations and industries. This meeting consisted of only oral session, a poster session was not carried out because of on-line meeting. This proceeding compiles the contents of report papers in the meeting.

Journal Articles

Present status of JAEA-Tokai tandem accelerator

Kabumoto, Hiroshi; Matsuda, Makoto; Nakamura, Masahiko; Ishizaki, Nobuhiro; Kutsukake, Kenichi; Otokawa, Yoshinori; Asozu, Takuhiro; Matsui, Yutaka; Nakagawa, Sohei; Abe, Shinichi

Proceedings of 19th Annual Meeting of Particle Accelerator Society of Japan (Internet), p.1109 - 1113, 2023/01

no abstracts in English

Journal Articles

Reports of electro-polishing implementation for quarter-wave resonators, 2

Nii, Keisuke*; Ida, Yoshiaki*; Ueda, Hideki*; Yamaguchi, Takanori*; Kabumoto, Hiroshi; Kamiya, Junichiro; Kondo, Yasuhiro; Tamura, Jun; Harada, Hiroyuki; Matsui, Yutaka; et al.

Proceedings of 19th Annual Meeting of Particle Accelerator Society of Japan (Internet), p.601 - 604, 2023/01

no abstracts in English

Journal Articles

Present status of JAEA-Tokai tandem accelerator

Matsuda, Makoto; Tayama, Hidekazu; Ishizaki, Nobuhiro; Kabumoto, Hiroshi; Nakamura, Masahiko; Kutsukake, Kenichi; Otokawa, Yoshinori; Asozu, Takuhiro; Matsui, Yutaka; Abe, Shinichi

Proceedings of 18th Annual Meeting of Particle Accelerator Society of Japan (Internet), p.394 - 398, 2021/10

no abstracts in English

Journal Articles

Reports of electropolishing implementation for quarter-wave resonators

Nii, Keisuke*; Ida, Yoshiaki*; Ueda, Hideki*; Yamaguchi, Takanori*; Kabumoto, Hiroshi; Kamiya, Junichiro; Kondo, Yasuhiro; Tamura, Jun; Harada, Hiroyuki; Matsui, Yutaka; et al.

Proceedings of 18th Annual Meeting of Particle Accelerator Society of Japan (Internet), p.334 - 337, 2021/10

no abstracts in English

Journal Articles

Present status of JAEA-Tokai tandem accelerator

Matsuda, Makoto; Ishizaki, Nobuhiro; Tayama, Hidekazu; Kabumoto, Hiroshi; Nakamura, Masahiko; Kutsukake, Kenichi; Otokawa, Yoshinori; Asozu, Takuhiro; Matsui, Yutaka; Abe, Shinichi; et al.

Proceedings of 17th Annual Meeting of Particle Accelerator Society of Japan (Internet), p.948 - 952, 2020/09

no abstracts in English

JAEA Reports

Development of new corona probe

Nakamura, Masahiko; Kutsukake, Kenichi; Matsuda, Makoto

JAEA-Technology 2019-022, 20 Pages, 2020/03

JAEA-Technology-2019-022.pdf:1.73MB

The JAEA Tokai tandem accelerator (an electrostatic accelerator) has the advantage that it can accelerate an ion beam with proportional energy to its acceleration voltage. Therefore the control of an ion beam energy can be automated when the control of the acceleration voltage can be automated by using the scaling operation system: an electromagnetics proportion of optical device parameters, and the ganged control system: a synchronized controlling related devices in the JAEA Tokai Tandem accelerator control system. We should improve several devices to achieve the automatic control of the accelerator voltage. Especially, the positioning system of the corona probe which adjusts the acceleration voltage had to be automated. However the original corona probe was difficult to be applied to the automation by its poor control system and low positioning precision. We have developed the new corona probe which improved defects of the original one. The new corona probe has an automatic and high precision positioning system and enhanced maintainability by new control system, new driven system and new position detection system. We describe about the development of the new corona probe in detail.

Journal Articles

Effects of multichance fission on isotope dependence of fission fragment mass distributions at high energies

Tanaka, Shoya; Aritomo, Yoshihiro*; Miyamoto, Yuya*; Hirose, Kentaro; Nishio, Katsuhisa

Physical Review C, 100(6), p.064605_1 - 064605_6, 2019/12

 Times Cited Count:13 Percentile:79.29(Physics, Nuclear)

Fission fragment mass distributions of $$^{234-240}$$U, $$^{236-242}$$Np, and $$^{238-244}$$Pu are studied using the Langevin approach in the widely excitation energy range as $$E^{*}$$ = 15-55 MeV. In the present calculation, neutron emission before fission, so called multichance fission, was introduced. The calculated results well demonstrated the experimental data, which shows the double-peak structure up to the highest excitation energies and the clear dependence on the initial fissioning nuclides. The trend is nicely correlated with the neutron binding energy of the compound nucleus that dominates the neutron emission probability before fission.

Journal Articles

Validation of the multinucleon transfer method for the determination of the fission barrier height

Kean, K. R.; Nishio, Katsuhisa; Hirose, Kentaro; Vermeulen, M. J.; Makii, Hiroyuki; Orlandi, R.; Tsukada, Kazuaki; Andreyev, A. N.; Tsekhanovich, I.*; Chiba, Satoshi*

Physical Review C, 100(1), p.014611_1 - 014611_6, 2019/07

 Times Cited Count:3 Percentile:32.64(Physics, Nuclear)

Journal Articles

Present status of JAEA-Tokai tandem accelerator

Matsuda, Makoto; Osa, Akihiko; Ishizaki, Nobuhiro; Tayama, Hidekazu; Kabumoto, Hiroshi; Nakamura, Masahiko; Kutsukake, Kenichi; Otokawa, Yoshinori; Asozu, Takuhiro; Matsui, Yutaka; et al.

Proceedings of 16th Annual Meeting of Particle Accelerator Society of Japan (Internet), p.1270 - 1273, 2019/07

The JAEA-Tokai tandem accelerator was operated over a total of 138 days, and delivered 16 different ions to the experiments in the research fields of nuclear physics, nuclear chemistry, atomic physics, solid state physics and radiation effects in material in FY2018. Maximum acceleration voltage was 16.6 MV. A new beam attenuator was installed at the entrance beam line of the tandem accelerator to facilitate control of the beam current and minimize stripper foil consumption. The main maintenance items included replacing the pellet chain used for about 68,000 hours and the drive motor for the high voltage terminal generator used for about 9 years. A fault has occurred in the building's oxygen deficiency monitor. This paper describes the operational status of the accelerators and the major technical developments of our facility.

Journal Articles

The Present conditions of the acceleration voltage after the acceleration tube update

Matsuda, Makoto; Osa, Akihiko; Ishizaki, Nobuhiro; Tayama, Hidekazu; Nakanoya, Takamitsu; Kabumoto, Hiroshi; Nakamura, Masahiko; Kutsukake, Kenichi; Otokawa, Yoshinori; Asozu, Takuhiro

JAEA-Conf 2018-003, p.126 - 131, 2019/02

no abstracts in English

Journal Articles

Present status of JAEA-Tokai tandem accelerator

Matsuda, Makoto; Kabumoto, Hiroshi; Tayama, Hidekazu; Nakanoya, Takamitsu; Nakamura, Masahiko; Kutsukake, Kenichi; Otokawa, Yoshinori; Asozu, Takuhiro; Matsui, Yutaka; Ishizaki, Nobuhiro; et al.

Proceedings of 15th Annual Meeting of Particle Accelerator Society of Japan (Internet), p.1271 - 1275, 2018/08

The JAEA-Tokai tandem accelerator was operated over a total of 64 days, and delivered 13 different ions to the experiments in the research fields of nuclear physics, nuclear chemistry, atomic physics, solid state physics and radiation effects in material in FY2017. After the vacuum accident occurred in December 2016 the accelerating voltage dropped to 12 MV. In order to remove dust and broken carbon foil in the accelerating tube, all 80 accelerator tubes were removed and rewashed. It took 4 months for cleaning and 2 months for reassembly. Therefore about 10 months were a maintenance period of an accelerator from February 2017. Along with the reconstruction of the accelerating tube, re-alignment of the accelerating tube was carried out. The operation resumed in December 2017 and it was possible to recover the maximum voltage to 17.4 MV without beam and 16.6 MV with beam with periodic conditioning work.

Journal Articles

Nuclear fission; A Review of experimental advances and phenomenology

Andreyev, A. N.; Nishio, Katsuhisa; Schmidt, K.-H.*

Reports on Progress in Physics, 81(1), p.016301_1 - 016301_61, 2018/01

 Times Cited Count:125 Percentile:91.8(Physics, Multidisciplinary)

Journal Articles

Present status of JAEA-Tokai tandem accelerator

Kabumoto, Hiroshi; Osa, Akihiko; Ishizaki, Nobuhiro; Tayama, Hidekazu; Matsuda, Makoto; Nakanoya, Takamitsu; Nakamura, Masahiko; Kutsukake, Kenichi; Otokawa, Yoshinori; Asozu, Takuhiro

Proceedings of 14th Annual Meeting of Particle Accelerator Society of Japan (Internet), p.1404 - 1408, 2017/12

The JAEA-Tokai tandem accelerator was operated over a total of 110 days, and delivered 22 different ions to the experiments in the research fields of nuclear physics, nuclear chemistry, atomic physics, solid state physics and radiation effects in material in FY2016. The damaged acceleration tubes by discharge were replaced with the spare tube at the regular maintenance period in March 2016, and the maximum accelerating voltage recovered to the 17 MV. However, an accident of vacuum breaking of all acceleration tubes was occurred in December, and accelerating voltage fell down to under 12 MV. Now, we are doing the maintenance to recover the performance of acceleration voltage. This paper describes the operational status of the accelerators and the major technical developments of our facility.

Journal Articles

Study of fission using multi-nucleon transfer reactions

Nishio, Katsuhisa; Hirose, Kentaro; Vermeulen, M. J.; Makii, Hiroyuki; Orlandi, R.; Tsukada, Kazuaki; Asai, Masato; Toyoshima, Atsushi; Sato, Tetsuya; Nagame, Yuichiro; et al.

EPJ Web of Conferences, 163, p.00041_1 - 00041_6, 2017/11

 Times Cited Count:1 Percentile:61.21(Nuclear Science & Technology)

Journal Articles

Quasifission and synthesis of super-heavy nuclei

Nishio, Katsuhisa

Genshikaku Kenkyu, 62(1), p.89 - 94, 2017/09

no abstracts in English

Journal Articles

New measurement of the $$^{8}$$Li($$alpha$$,n)$$^{11}$$B reaction in a lower-energy region below the Coulomb barrier

Das, S. K.*; Fukuda, Tomokazu*; Mizoi, Yutaka*; Ishiyama, Hironobu*; Miyatake, Hiroari*; Watanabe, Yutaka*; Hirayama, Yoshikazu*; Jeong, S. C.*; Ikezoe, Hiroshi*; Matsuda, Makoto; et al.

Physical Review C, 95(5), p.055805_1 - 055805_4, 2017/05

 Times Cited Count:3 Percentile:27.61(Physics, Nuclear)

JAEA Reports

JAEA-Tokai tandem annual report 2013; April 1, 2013 - March 31, 2014

Department of Research Reactor and Tandem Accelerator

JAEA-Review 2016-025, 101 Pages, 2016/12

JAEA-Review-2016-025.pdf:7.86MB

The JAEA-Tokai tandem accelerator complex has been used in various research fields such as nuclear science and material science by researchers not only of JAEA but also from universities, research institutes and industrial companies. This annual report covers developments of accelerators and research activities carried out using the tandem accelerator and superconducting booster from April 1, 2013 to March 31, 2014. Thirty-one summary reports were categorized into seven research/development fields:(1) accelerator operation and development, (2) nuclear structure, (3) nuclear reaction, (4) nuclear chemistry, (5) nuclear theory, (6) atomic physics and solid state physics (7) radiation effects in materials. This report also lists publications, meetings, personnel, committee members, cooperative researches and common use programs.

Journal Articles

Present status of JAEA-Tokai tandem accelerator and booster

Matsuda, Makoto; Osa, Akihiko; Ishizaki, Nobuhiro; Tayama, Hidekazu; Nakanoya, Takamitsu; Kabumoto, Hiroshi; Nakamura, Masahiko; Kutsukake, Kenichi; Otokawa, Yoshinori; Asozu, Takuhiro

Proceedings of 13th Annual Meeting of Particle Accelerator Society of Japan (Internet), p.1413 - 1417, 2016/11

The tandem accelerator was operated over a total of 140 days and delivered 22 different ions to the experiments in the fields of nuclear physics, nuclear chemistry, atomic physics, solid state physics and radiation effects in material. Maximum accelerating voltage is keeping up 18 MV and there was used for ten days on this voltage. However, electric discharge was occurred frequently in December and accelerating voltage fell to 12 MV. The damaged acceleration tubes were replaced with the spare tube at the regular maintenance period in March. The superconducting booster was not operated. This paper describes the operational status of the accelerators and the major technical developments.

137 (Records 1-20 displayed on this page)